Build
From the first day the crew arrives for the pre-construction meeting, down to the exacting details of the final punch list, coupled with our regular service and Industry leading warranty options, your project build is outlined and internally scheduled to stay on track well (PAST) passed the final inspections. Our team of specialists are professionally managed to ensure a smooth process from the beginning of the field works. Rollover the images below to learn more about each step in our detailed build process.
-
Site Preparation
Pre-construction eurodale team site meeting, removal of items to be salvaged, hoarding and protection of site for security, safety & existing finishes as needed.
-
Demolition, Excavation, Shoring & Foundation
Surveyor to mark property, dss testing, abatement, demolition, excavation and shoring for new foundation as required per design specifications and ministry regulations.
-
Shell Erection & Structural
Lead carpenters, framers, steel erectors fabricate the structural skeleton of the home from foundation up to roof.
-
Systems Installations
Plumbing, hvac and electrical rough ins are performed and inspected along with the frame by engineers and/or the municipality. Insulation and drywall follow suit.
-
Interior Finishes
Custom millwork, floor and wall coverings, trim, doors and fixtures are all installed inside the home.
-
Exterior Finishes
Rainscreen, masonry, siding, stucco or other exterior skin, including flashings and caulkings as required. often occuring in conjuntion with interior finish stage.
-
Punch List
Client review of the space with the contractor to list out final touch ups to be addressed prior to move in. Project is now complete.
-